Hola amigos! Como estas (how are you)?
Today,
the group returned to Rosa’s house, a place that is very dear to our hearts,
because the site underwent such a metamorphosis during our last mission trip.
Rosa and her family now have a working bathroom, complete with a shower, toilet
and pilla, but are in need of a bedroom (not to mention furniture to go in the
bedroom). Now, the job at Rosa’s house is to add a 16x9 ft bedroom, so today the
team at Rosa’s house had to dig a 22 in. foundation and 29 in. footers, make
rebar support columns, and lay the foundation for her soon to be bedroom.
During
our first few minutes at Rosa’s, we carried cinderblocks from the road to Rosa’s
house; which was very reminiscent of our first job at her house. Unfortunately,
after the morning workout, there were not as many tools as there were people. To
give all the members of the team something to do, Danielle proposed that a
group of us venture further into the mountains to work on a stove for someone.
We had already worked on another stove previously in the trip and were fairly comfortable
with the task. Tracey, Madison, Will, Cooper, Kay, Lorraine, Russell, Chris and
myself decided to go.
Danielle
promised us a ten-minute hike to the other job site, but was misinformed, at
least by American standards. What might take a Honduran ten minutes, instead
took us Americans forty five. Of course, that might have something to do with
the fact that we were either walking straight up the mountain or straight down
the mountain, with hardly any level ground in between. Our path was simply a
washed out creek bed provided by mother nature. Nobody fell or got hurt, which
was a miracle of God. Even Danielle was huffing and puffing by the end of the
walk. The rest of us were just hyperventilating.
After
the feelings returned to our legs, we finally got to work on the stove. The
stove was in a very dark room. The only light came from the doorway and the
person in charge of holding a flashlight so Danielle could actually see to
measure, lay out brick, and fill in mud. Madison, Tracey, Lorraine and I
alternated between muddin’, while Danielle laid the bricks. When Danielle
needed the bricks to be cut, Will used a machete to trim the bricks down. Chris
tried a few times, but then gave the job back to Will, much to Danielle’s
relief. By end of the day, the only part of the stove that was unfinished was
the pipe that lead up to the ceiling and we began our long journey back to Rosa’s
house.
Here are photos of the stove instillation group:
Mooking the stove |
Laying bricks for the stove |
Mudding the stove |
Here are photos of the job at Rosa's:
The site of the foundation before the digging started. The batter boards and batter strings - this time we didn't have to use fishing line. |
Digging commences |
Becky and Pat wiring the rebar frames |
Hunter digging the footer |
29" footer after the mook had been poured into it |
Duct tape is the international tool of choice. Stabilizing the rebar frame by duct taping it to wooden boards |
Lorie
Thank you for exibiting such dedication and effort.
ReplyDeleteI bet you smile is going a long way!
ReplyDeleteI bet your smile goes a long way